Ardra EMS for Indian plants

See your power bill before it arrives.

AI-driven energy management for Indian plants. It reads any meter, SCADA or bill, forecasts demand and ranks fixes in rupees.

AI forecast, this block438 / 450 kVA
kWhDemand now428kVAARDRA ONE

Ardra ONE is optional. EMS also reads existing meters, SCADA and files.

One bill. Four places the money goes.

An example HT bill from an 11 kV plant. Scroll to take it apart.

Example DISCOM
HT industrial supply · 11 kV
Bill for October 2026
Example bill
Contract demand450 kVA
Recorded max demand510 kVA
Units consumed76,000 kWh
Average power factor0.88
Energy charges 76,000 × ₹7.405,62,400
Demand charges 510 kVA × ₹3001,53,000
Excess demand 60 kVA over contract18,000
Time-of-day surcharge peak blocks41,800
Power factor penalty PF 0.8821,600
Electricity duty and taxes54,600
Total payable₹8,51,400

Rates and amounts are examples. Your DISCOM's tariff will differ.

₹8,51,400Most plant heads only see this number.

The total hides four charges. Each grows for a different reason and needs a different fix.

₹5,62,400Energy: every unit, used or wasted.

Idle compressors, lights in empty sheds and chillers running after the line stops all land here.

₹1,71,000Demand: one bad half-hour sets the month.

510 kVA recorded against 450 contracted. The excess is billed at a higher rate.

₹41,800Time of day: the same unit, at a higher price.

Furnaces and batch loads started in peak hours cost more for the same work.

₹21,600Power factor: often a failed capacitor stage.

Ardra tracks PF per feeder and flags the day a capacitor stage drops out.

₹45,000–69,000Recoverable each month, in this example.

In the demo we do this on your real bill. Do it on my bill

Instant AI bill check

Upload a bill. Get a first read in seconds.

The AI reads tariff, demand, power factor and peak charges, then points to likely leaks. An engineer audit goes deeper.

Coming soon

Instant bill check — coming soon. Until then, an engineer can read your bill on a demo call.

Request a demo

What the plant head sees at 9 a.m.

Yesterday's demand, cost and power factor per feeder, with what needs attention first.

Ardra EMSPlant 1Yesterday, 00:00 to 24:00Illustrative data
Cost₹27,940₹1,210 above a normal Tuesday
Energy3,780 kWh41.2 kWh per tonne
Peak demand441 kVA98% of contract, 14:00 block
Power factor0.97Feeder 3 dipped to 0.86
020030040000:0006:0012:0018:0024:00Contract 450 kVA
WhatsApp, 14:22Demand is 438 of 450 kVA. Block ends 14:30.Hold furnace 2 for 8 minutes.
Needs attention
Demand at 98% of contract14:00 block. Furnace 2 and compressor 3 started within 4 minutes.
Feeder 3 PF down to 0.86Capacitor stage 2 likely out since 03:40.
Compressor house ran 38 kW on SundayNo production scheduled. ₹6,100 for the day.

AI inside Ardra EMS

Five jobs the AI does every day.

Each runs on your plant's own readings and shows its working.

See how the AI works
  • Ask Ardra about your plantQuestions in plain words, answered from your meters with a chart and the readings used.“Why was yesterday higher than Tuesday?”
  • Demand forecast for the running blockWarns the shift in-charge while there is still time to hold a load.Block ends 14:30 · forecast 438 of 450 kVA
  • Idle and off-shift anomaliesFinds machines running when nothing is scheduled.Compressor house 38 kW on Sunday · ₹6,100
  • Fixes ranked in rupeesEvery recommendation carries a rupee value, so the biggest one goes first.Capacitor stage 2, feeder 3 · about ₹18,000/month
  • A weekly report it writes for youOne page every Monday, by email and WhatsApp.Last week: ₹4.2 lakh, 3 alerts, 1 fix pending

Energy audit, paid once

Not ready for hardware? Start with your bills.

An energy engineer reads 12 months of DISCOM bills and sends fixes ranked by rupee value.

  • Small₹25,000Shops, offices and clinics
  • Medium₹50,000Factories, schools and medium plants
  • Large₹1,00,000Large manufacturing units
  • EnterpriseQuotedSeveral sites, or a site visit

Results, with names on them.

We publish a result only when the customer signs off on it.

Client-approved case study

25% less energy at a 200,000 sq ft commercial facility in Mumbai

Ardra EMS found the HVAC running at 40% overcapacity outside peak hours. After three months of optimisation the facility used 25% less energy, about ₹15 lakh a month.

Read the case study
"Ardra AI helps us to monitor energy consumption, Ardra AI team is very professional and dedicated."
Rajesh B. Desai, Director, SSSIHMS, Andhra Pradesh
"Ardra AI Energy management system helped us to reduce monthly energy bill of our retail outlet chain we manage."
Ashish Sharma, Sr Manager, Facility Management

Send us last month's bill. We'll show you where it went.

A 30-minute call with an engineer. Bring one bill and leave with its three biggest leaks.

Request a demo
Request a demo