- ₹15 lakhsaved per month, approximately
- 2equipment failures caught before they happened
25% less energy at a 200,000 sq ft commercial facility in Mumbai
Ardra EMS found the HVAC running at 40% overcapacity outside peak hours. After three months of optimisation the facility used 25% less energy, about ₹15 lakh a month.
Read the case study