25% less energy at a 200,000 sq ft commercial facility in Mumbai
Ardra EMS found the HVAC running at 40% overcapacity outside peak hours. After three months of optimisation the facility used 25% less energy, about ₹15 lakh a month.
- 25% less energy overall (after 3 months)
- ₹15 lakh saved per month, approximately (after 3 months)
- 2 equipment failures caught before they happened